Odoo for manufacturing and production costing

What did the last manufacturing order cost, and why did it differ from the estimate? Start with one product, its bill of materials and its operations so the production manager can explain changes in consumption and run time.

What does this solve?

A bill of materials describes what a batch should consume. Deciding whether to revise the production plan or the selling price takes different evidence: the materials actually issued, the number of good units produced and the time each operation occupied a work center.

What the work covers

Test the bill of materials

Define the components, units and output quantity together. For a subassembly, decide whether it is produced and stocked separately or assembled as part of the final operation.

Schedule work at the right center

Assign cutting, assembly or packing to the appropriate work center. The planner can identify where the work belongs and which operation needs to finish first.

Place checks where they matter

Decide which incoming or production step needs an inspection and which lot to record. Test whether the team can trace a finished lot back to the material it consumed.

Explain order costs

Compare materials and operation costs for one order. Extra labor time and additional material consumption call for different actions, even if the total variance is identical.

How we work with your team

  1. Prepare a trial product

    Choose a regularly made item. Enter its bill of materials, units, expected operation time and work center cost rate.

  2. Run an order

    Check component availability, then record actual consumption, time, inspection results and good output.

  3. Review the variance

    Close the order and compare planned and actual figures. Review deviations with the supervisor before changing standard quantities or times.

Before the demo: test a specification change on open orders

Choose a product whose specification changed without a new finished item code, such as a bottle fitted with a different cap. Bring both bills of materials, the authorized change date, the cap’s purchasing and issue units, and an order released before the change. Identify who decides what to do with the old caps still in stock. Sample records are enough; supplier names and engineering drawings are unnecessary.

Open the existing order, then prepare a new one for the same finished item. Compare the picking instructions a storekeeper sees. Ask how a supervisor records an approved substitution if the specified cap is unavailable. The test passes when quality can trace a finished batch back to the component actually consumed, the planner can identify orders affected by the change, and updating the specification preserves the material history of earlier batches. Then reverse the search: given a defective cap lot, identify the affected output batches and exclude those built with a different shipment.

Questions before you start

Do all products have to be loaded before a trial?

No. Select one representative product with a reliable bill of materials and run a complete manufacturing order before loading the rest of the range.

Is a bill of materials enough to cost a product?

It covers the components. To include operations, define the work centers and cost rates, then capture the actual time used on the order.

When should we use a lot rather than a serial number?

A lot identifies a group with a shared source or production run. A serial number identifies an individual unit when service or warranty work must follow that specific item.

What should we bring to a manufacturing demo?

Bring a bill of materials, operation sequence and a completed production record with time and materials issued. Add an inspection sheet if quality is in scope.

Book a demo

Leave your details and a Plus Tech consultant will contact you within one business day.

We use your details to follow up on this request. Privacy policy

Book a free demo

+966 57 745 4545

Further reading